ARCUS — Bridge Failure Research

ARCUS Atlas record

Ponte di via Stalingrado

This record concerns Ponte di via Stalingrado in Bologna. Recorded period: March 2001. ARCUS outcome classification: TC (approach-embankment failure). Recorded cause category: Unspecified. Reported trigger: Excavation / construction works. Reported process: Other documented mode. Reported component: Approach embankment. Recorded fatalities: 0; injuries: 0. Cause evidence: Probable.

Documentary notes and limitations

The failure concerns the Via Stalingrado approach embankment, not an established deck collapse. TC is applied as an ARCUS operational outcome. Sources describe excavation near the retaining wall but do not fully establish lane passability or the definitive technical cause.

ARCUS ID
IT01.03.01
Date
2001-03-17
Municipality
Bologna
Province
Bologna
Region
Emilia-Romagna
Coordinates
44.5040572644014, 11.3536555374575 · exact location
Crossing
Bologna railway node
Use
Municipal
Severity
TC
Structural type
Beam bridge
Material
Reinforced concrete
Cause category
Human-induced
Specific cause
Unspecified
Failure trigger
Excavation / construction works
Failure process
Other documented mode
Component involved
Approach embankment
Cause evidence
Probable
Source confidence
Medium
Victims
0
Injuries
0

Sources and scientific context (4)

  1. I dubbi sul ponte di via Libia: “Sicuri che sia sicuro?” [foto] (News · Zic.it – Zeroincondott · 2018-10-12)
  2. Dossier Divieto di sosta e speculazione: comunicazione del 26 aprile 2001 (Official/Technical · CARC / dossier archive)
  3. Curriculum professionale: incarico tecnico per Ponte di via Stalingrado nel 2001 (Official/Technical · Fondazione CNI)
  4. Piazza Bilotti: riproduzione del precedente di Bologna (News · QuiCosenza)

Return to the Atlas · Propose a correction or new evidence