ARCUS Atlas record
Ponte SP17 Floriano–Villa Ricci sul Salinello
This record concerns Ponte SP17 Floriano–Villa Ricci sul Salinello in Campli. Recorded period: March 2011. ARCUS outcome classification: PC. Recorded cause category: Hydraulic. Reported trigger: Flood. Reported process: Scour. Reported component: Pier / foundation. Recorded fatalities: 0; injuries: 0. Cause evidence: Documented.
Documentary notes and limitations
During the early March 2011 Salinello flood, foundation scour lowered a pier of the SP17 gravity-arch bridge between Floriano and Villa Ricci by about one metre. The roadway deformed and cracked and the crossing was closed to traffic. Demolition and reconstruction were later works. The municipality dates the flood to 1 March, the date recorded by S3 P180; the technical account does not establish the exact failure day. The original material is unspecified. The 53 m length and vertical-erosion code remain attributed to D’Angelo, Ballio and Ravazzani (2025), S3 P180; the technical account gives an approximate length of 60 m. PC is unchanged. The classification in supplementary dataset S3 by D’Angelo, Ballio and Ravazzani (2025), record P180, is attributed to its authors and is not a new ARCUS measurement.
- ARCUS ID
- IT11.03.03
- Date
- 2011-03-01
- Municipality
- Campli
- Province
- Teramo
- Region
- Abruzzo
- Coordinates
- 42.7795, 13.7693 · exact location
- Crossing
- Salinello river
- Use
- Provincial/Regional
- Severity
- PC
- Structural type
- Arch bridge
- Cause category
- Natural
- Specific cause
- Hydraulic
- Failure trigger
- Flood
- Failure process
- Scour
- Component involved
- Pier / foundation
- Cause evidence
- Documented
- Source confidence
- Medium
- Victims
- 0
- Injuries
- 0
Sources and scientific context (3)
- Teramo. Alluvione: la situazione di tutte le strade della provincia di Teramo (News · giulianovanews.it · 2011-03-08)
- Geomorphologic risk factors for river bridges (2025), supplementary dataset S3 P180 (Scientific · D'Angelo, Ballio & Ravazzani)
- La Provincia inizierà il ripristino del ponte sul Salinello tra Sant’Omero e Campli (Official/Technical · Comune di Sant’Omero · 2011-10-09)