ARCUS Atlas record
Bridge over Bevano stream
This record concerns Bridge over Bevano stream in Cantiano. Recorded date: 15 September 2022. ARCUS outcome classification: TC. Recorded cause category: Hydraulic. Reported trigger: Flood. Reported process: Overtopping / hydrodynamic action. Reported component: Deck / superstructure. Recorded fatalities: 0; injuries: 0. Cause evidence: Documented.
Documentary notes and limitations
The classification in supplementary dataset S3 by D’Angelo, Ballio and Ravazzani (2025), record P211, is attributed to its authors and is not a new ARCUS measurement. Hydraulic loading alone does not establish bridge overtopping.
- ARCUS ID
- IT22.09.08
- Date
- 2022-09-15
- Municipality
- Cantiano
- Province
- Pesaro Urbino
- Region
- Marche
- Coordinates
- 43.4702, 12.6271 · exact location
- Crossing
- Bevano stream
- Use
- Cycle-pedestrian
- Severity
- TC
- Structural type
- Beam bridge
- Material
- Reinforced concrete
- Cause category
- Natural
- Specific cause
- Hydraulic
- Failure trigger
- Flood
- Failure process
- Overtopping / hydrodynamic action
- Component involved
- Deck / superstructure
- Cause evidence
- Documented
- Source confidence
- Medium
- Victims
- 0
- Injuries
- 0
Sources and scientific context (4)
- Rapporto di evento preliminare – Alluvione Marche 15-16 settembre 2022 (Flood context · Protezione Civile · 2022-09-15)
- Maltempo Marche: 84 cantieri del Genio Civile per la sistemazione dei ponti e delle infrastrutture (Flood context · ANSA · 2022-11-21)
- Alluvione delle Marche del 2022 – Vigili del Fuoco (Flood context · Vigili del Fuoco · 2022-09-15)
- Geomorphologic risk factors for river bridges (2025), supplementary dataset S3 (Scientific · D'Angelo, Ballio & Ravazzani)