ARCUS — Bridge Failure Research

ARCUS Atlas record

Bridge over Bevano stream

This record concerns Bridge over Bevano stream in Cantiano. Recorded date: 15 September 2022. ARCUS outcome classification: TC. Recorded cause category: Hydraulic. Reported trigger: Flood. Reported process: Overtopping / hydrodynamic action. Reported component: Deck / superstructure. Recorded fatalities: 0; injuries: 0. Cause evidence: Documented.

Documentary notes and limitations

The classification in supplementary dataset S3 by D’Angelo, Ballio and Ravazzani (2025), record P211, is attributed to its authors and is not a new ARCUS measurement. Hydraulic loading alone does not establish bridge overtopping.

ARCUS ID
IT22.09.08
Date
2022-09-15
Municipality
Cantiano
Province
Pesaro Urbino
Region
Marche
Coordinates
43.4702, 12.6271 · exact location
Crossing
Bevano stream
Use
Cycle-pedestrian
Severity
TC
Structural type
Beam bridge
Material
Reinforced concrete
Cause category
Natural
Specific cause
Hydraulic
Failure trigger
Flood
Failure process
Overtopping / hydrodynamic action
Component involved
Deck / superstructure
Cause evidence
Documented
Source confidence
Medium
Victims
0
Injuries
0

Sources and scientific context (4)

  1. Rapporto di evento preliminare – Alluvione Marche 15-16 settembre 2022 (Flood context · Protezione Civile · 2022-09-15)
  2. Maltempo Marche: 84 cantieri del Genio Civile per la sistemazione dei ponti e delle infrastrutture (Flood context · ANSA · 2022-11-21)
  3. Alluvione delle Marche del 2022 – Vigili del Fuoco (Flood context · Vigili del Fuoco · 2022-09-15)
  4. Geomorphologic risk factors for river bridges (2025), supplementary dataset S3 (Scientific · D'Angelo, Ballio & Ravazzani)

Return to the Atlas · Propose a correction or new evidence