ARCUS — Bridge Failure Research

ARCUS Atlas record

Bridge over Fiastra river

This record concerns Bridge over Fiastra river in Corridonia. Recorded period: March 2011. ARCUS outcome classification: TC. Recorded cause category: Hydraulic. Reported trigger: Flood. Reported process: Scour. Reported component: Multiple components. Recorded fatalities: 0; injuries: 0. Cause evidence: Documented.

Documentary notes and limitations

The exact failure day is not unambiguously documented; the record date is a chronological reference, not confirmation of day-level precision. The available sources do not fully establish damage to primary members and lane passability. The recorded TC/PC code is the ARCUS classification, not a new technical assessment. The classification in supplementary dataset S3 by D’Angelo, Ballio and Ravazzani (2025), record P057, is attributed to its authors and is not a new ARCUS measurement. Documented interval: 1 March 2011 – 2 March 2011. The recorded date is the first day of that interval.

ARCUS ID
IT11.03.04
Date
2011-03-01
Municipality
Corridonia
Province
Macerata
Region
Marche
Coordinates
43.2564, 13.4809 · exact location
Crossing
Fiastra river
Use
Provincial/Regional
Severity
TC
Structural type
Beam bridge
Material
Reinforced concrete
Cause category
Natural
Specific cause
Hydraulic
Failure trigger
Flood
Failure process
Scour
Component involved
Multiple components
Cause evidence
Documented
Source confidence
Medium
Victims
0
Injuries
0

Sources and scientific context (3)

  1. Cede un pilone del ponte tra Corridonia e Colbuccaro (News · Cronache Maceratesi · 2011-03-02)
  2. Infrastrutture, 2 milioni di euro per il ponte di Colbuccaro (News · Corriere Adriatico · 2014-07-30)
  3. Geomorphologic risk factors for river bridges (2025), supplementary dataset S3 P057 (Scientific · D'Angelo, Ballio & Ravazzani)

Return to the Atlas · Propose a correction or new evidence