ARCUS — Bridge Failure Research

ARCUS Atlas record

Ponte di Cernera

Total collapse of the Ponte di Cernera on the SP (ex-SP41) in the Contrada Piano di Cernera, territory of Massafra (Taranto, Apulia) on 8 September 2003, caused by the catastrophic flash flood that struck the western Taranto province with 212mm of rain in less than 24 hours at Massafra, 225mm at Castellaneta. The broader event killed two people (Cosimo Filiberto Fanelli and Domenico Quarato) and caused €28 million of damage in Palagiano alone. No fatalities directly attributed to this specific bridge collapse. The bridge was subsequently rebuilt but collapsed again during the October 2005 flood (B05.10.01), requiring a second reconstruction project managed by PPV Consulting. Piena documentata; meccanismo di dettaglio non ricostruibile dalle fonti disponibili.

ARCUS ID
IT03.09.01
Date
2003-09-08
Municipality
Massafra
Province
Taranto
Region
Puglia
Coordinates
40.6013116311144, 17.0716591058672 · approximate location
Crossing
Contrada Piano di Cernera
Use
Provincial/Regional
Severity
TC
Structural type
Beam bridge
Material
Reinforced concrete
Cause category
Natural
Specific cause
Hydraulic
Failure trigger
Flood
Cause evidence
Unspecified
Source confidence
High
Victims
0
Injuries
0

Documentary sources (3)

  1. 8 settembre 2003: l'alluvione nel tarantino – crollo Ponte di Cernera a Massafra (News · GeoMagazine · 2014-09-09)
  2. Quindici anni fa l'alluvione di Massafra: crollo del Ponte di Cernera e danni immensi (News · ViviWebTv · 2014-09-09)
  3. Massafra, quattro anni di attese per il ponte di Cernera: storia del doppio crollo 2003 e 2005 (News · La Gazzetta del Mezzogiorno · 2008-01-31)

Return to the Atlas · Propose a correction or new evidence