Ponte Gilino

This record concerns Ponte Gilino in Mongrando. Recorded date: 17 April 2025. ARCUS outcome classification: TC. Recorded cause category: Hydraulic. Reported trigger: Flood. Recorded fatalities: 0; injuries: 0. Cause evidence: Probable.

Documentary notes and limitations

The detailed physical mechanism is not unambiguously established; reported classifications retain the record's stated evidence level.

ARCUS ID
IT25.04.01
Date
2025-04-17
Municipality
Mongrando
Province
Biella
Region
Piemonte
Coordinates
45.5125672, 8.02479575 · exact location
Crossing
Elvo stream
Use
Municipal
Severity
TC
Structural type
Beam bridge
Material
Reinforced concrete
Construction year
1970
Cause category
Natural
Specific cause
Hydraulic
Failure trigger
Flood
Cause evidence
Probable
Source confidence
High
Victims
0
Injuries
0

Sources and scientific context (4)

  1. Maltempo in Piemonte, crolla ponte nel Biellese (News · ANSA · 2025-04-17)
  2. Il Piemonte chiede lo stato di emergenza, altissimo il rischio valanghe (News · Rai News · 2025-04-17)
  3. Maltempo, un ponte crollato sull’Elvo e trenta persone sfollate nel Biellese sotto il diluvio (News · La Stampa · 2025-04-18)
  4. Geomorphological risk factors for river bridges (Scientific context · Journal Paper · 2025-05-27)