Ponte Sahida

This record concerns Ponte Sahida in Oliena. Recorded date: 18 November 2013. ARCUS outcome classification: TC. Recorded cause category: Hydraulic. Reported trigger: Flood. Reported process: hydraulic loading (overtopping not established). Reported component: Multiple components. Recorded fatalities: 0; injuries: 0. Cause evidence: Documented.

Documentary notes and limitations

The classification in supplementary dataset S3 by D’Angelo, Ballio and Ravazzani (2025), record P074, is attributed to its authors and is not a new ARCUS measurement. Hydraulic loading alone does not establish bridge overtopping.

ARCUS ID
IT13.11.04
Date
2013-11-18
Municipality
Oliena
Province
Nuoro
Region
Sardegna
Coordinates
40.2963, 9.3932 · exact location
Crossing
Cedrino river
Use
National
Severity
TC
Structural type
Beam bridge
Material
Reinforced concrete
Cause category
Natural
Specific cause
Hydraulic
Failure trigger
Flood
Failure process
Overtopping / hydrodynamic action
Component involved
Multiple components
Cause evidence
Documented
Source confidence
High
Victims
0
Injuries
0

Sources and scientific context (2)

  1. Piano degli interventi ex art. 1 c. 5 OCDPC n. 122 del 20/11/2013 - Allegato A all'Ordinanza commissariale n. 23 del 23/01/2014 (Official/Technical · Commissario delegato OCDPC 122/2013 - Regione Autonoma della Sardegna · 2014-01-23)
  2. D'Angelo, Ballio & Ravazzani (2025) — Geomorphologic risk factors for river bridges, supplement S3 (Scientific · Journal Paper)