ARCUS — Bridge Failure Research

ARCUS Atlas record

Ponte sul Rio Mollarino, località Serre

This record concerns Ponte sul Rio Mollarino, località Serre in Picinisco. Recorded date: 15 October 2020. ARCUS outcome classification: PC (approach-embankment failure). Recorded cause category: Hydraulic. Reported trigger: Flood. Reported process: Bank erosion / embankment failure. Reported component: Approach embankment. Recorded fatalities: 0; injuries: not documented. Cause evidence: Documented.

Documentary notes and limitations

The detailed physical mechanism is not unambiguously established; reported classifications retain the record's stated evidence level. The classification in supplementary dataset S3 by D’Angelo, Ballio and Ravazzani (2025), record P164, is attributed to its authors and is not a new ARCUS measurement.

ARCUS ID
IT20.10.13
Date
2020-10-15
Municipality
Picinisco
Province
Frosinone
Region
Lazio
Coordinates
41.6224, 13.8572 · exact location
Crossing
Mollarino stream
Use
Municipal
Severity
PC
Structural type
Beam bridge
Material
Reinforced concrete
Cause category
Natural
Specific cause
Hydraulic
Failure trigger
Flood
Failure process
Bank erosion / embankment failure
Component involved
Approach embankment
Cause evidence
Documented
Source confidence
Medium
Victims
0

Sources and scientific context (3)

  1. Maltempo Frosinone, crolla ponte a Picinisco (News · ANSA · 2020-10-15)
  2. Maltempo, crolla ponte nel Frusinate (News · la Repubblica · 2020-10-15)
  3. D'Angelo, Ballio & Ravazzani (2025) — Geomorphologic risk factors for river bridges, supplement S3 (Scientific · Journal Paper)

Return to the Atlas · Propose a correction or new evidence