ARCUS Atlas record
Ponte della Becca (SS617)
Partial collapse of the historic Ponte della Becca (1912 steel truss bridge, SS617, ~1,080 m) on 17 March 2011: pier 9 suddenly collapsed during a Po river flood due to riverbed scour undermining its foundation, documented since November 2010 as anomalous pier rotation. The bridge was saved by two temporary pile-supported bents built in 45 days; surveys in June 2011 showed the scour hole expanding towards pier 8 (founded only 2 m deep). Il 17/03/2011, durante la piena del Po, crollo' improvvisamente la pila 9 del ponte della Becca (acciaio a traliccio, 1912, ~1.080 m, SS617 Broni-Pavia), 'spazzata via senza lasciarne le macerie'. Analisi tecniche (Ingenio/Studio Calvi): gia' da nov. 2010 anomala rotazione-traslazione della pila per erosione del fondo alveo da turbolenza idraulica, con scalzamento della fondazione; i rilievi del giugno 2011 mostrarono la fossa in ampliamento fino a minacciare la pila 8, fondata a soli 2 m (contro gli 11 m delle altre). Struttura salvata con due appoggi provvisori su pali da 45 m realizzati in 45 giorni. D'Angelo, Ballio & Ravazzani (2025), 'Geomorphologic risk factors for river bridges', IJDRR, database supplementare S3, record P116 (dec=1, PC, danno alle pile) concorda.
- ARCUS ID
- IT11.03.05
- Date
- 2011-03-17
- Municipality
- Mezzanino
- Province
- Pavia
- Region
- Lombardia
- Coordinates
- 45.1405539, 9.2267611 · exact location
- Crossing
- Po river (confluenza Ticino)
- Use
- Provincial/Regional
- Severity
- PC
- Structural type
- Truss
- Material
- Steel
- Construction year
- 1912
- Cause category
- Natural
- Specific cause
- Hydraulic
- Failure trigger
- Flood
- Failure process
- Scour
- Component involved
- Pier / foundation
- Cause evidence
- Documented
- Source confidence
- High
- Victims
- 0
- Injuries
- 0
Documentary sources (3)
- Ingenio: 'Ponti a struttura mista: la complessa messa in sicurezza di uno dei ponti storici del Po' (Official/Technical · Technical article)
- D'Angelo, Ballio & Ravazzani (2025), 'Geomorphologic risk factors for river bridges', IJDRR, database supplementare S3 (Scientific · Journal Paper)
- Il Giorno: 'Quei 45 giorni che salvarono il ponte della Becca' (News · Newspaper)