Ponte Bertenga

This record concerns Ponte Bertenga in Torre Pellice. Recorded date: 6 November 2011. ARCUS outcome classification: TC. Recorded cause category: Hydraulic. Reported trigger: Flood. Reported process: Scour. Reported component: Multiple components. Recorded fatalities: 0; injuries: 0. Cause evidence: Documented.

Documentary notes and limitations

On 6 November 2011, the Pellice flood caused the right pier of the Bertenga bridge to fail and the right span to collapse. ARPA Piemonte identifies the crossing on the Bertenga municipal road in its 2008 event report. The provincial authority’s temporary ford after the 2011 flood does not change the road class. ARCUS retains the 84.69 m length, riverbed piers and vertical erosion attributed to D’Angelo, Ballio and Ravazzani (2025), S3 P067. The metropolitan authority reports 78 m for the old bridge without specifying how it was measured; the discrepancy is unresolved. The original structural system and material are unspecified. TC is unchanged. The classification in supplementary dataset S3 by D’Angelo, Ballio and Ravazzani (2025), record P067, is attributed to its authors and is not a new ARCUS measurement.

ARCUS ID
IT11.11.01
Date
2011-11-06
Municipality
Torre Pellice
Province
Torino
Region
Piemonte
Coordinates
44.817, 7.2062 · exact location
Crossing
Pellice river
Use
Municipal
Severity
TC
Cause category
Natural
Specific cause
Hydraulic
Failure trigger
Flood
Failure process
Scour
Component involved
Multiple components
Cause evidence
Documented
Source confidence
High
Victims
0
Injuries
0

Sources and scientific context (7)

  1. Rapporto di evento alluvionale del novembre 2011 – Ponte Bertenga (Official/Technical · Regione Piemonte)
  2. Event documentation: Ponte Bertenga (News · vitadiocesanapinerolese.it)
  3. Crollo del ponte Bertenga a Torre Pellice (News · TorinoToday · 2011-11-07)
  4. Crolla ponte sul Pellice: ore d’ansia a Moncalieri (News · La Stampa · 2011-11-07)
  5. Geomorphologic risk factors for river bridges (2025), supplementary dataset S3 P067 (Scientific · D'Angelo, Ballio & Ravazzani)
  6. Rapporto preliminare sull’evento alluvionale del 28–30 maggio 2008 (Official/Technical · ARPA Piemonte)
  7. Cronache da Palazzo Cisterna – Ricostruzione del ponte della Bertenga (Official/Technical · Città metropolitana di Torino · 2017-09-01)

Return to the Atlas · Propose a correction or new evidence